Cloud Migration Checklist for Small Businesses: Steps, Strategy and Challenges
A cloud migration checklist is the ordered list of tasks that moves your email, files, applications and servers into the cloud without losing data or more working time than you planned. For a small business it comes down to five stages: take inventory, choose a strategy for each system, prepare accounts and data, move a pilot group, then cut over, verify and retire the old systems.
This guide is the planning companion to our cloud migration services.
What does a small business actually move to the cloud?
Usually four things: email, shared files, the line-of-business applications you use every day, and the servers they run on. NIST defines cloud computing as on-demand network access to a shared pool of configurable computing resources that can be provisioned and released quickly with minimal management effort (NIST SP 800-145, 2011). In practice:
- Email to Microsoft 365 or Google Workspace. From your own Exchange server, Microsoft’s cutover method can move every mailbox at once and handles up to 2,000, though Microsoft calls 150 or fewer more reasonable. From a host reached over IMAP, only mail folders copy; contacts and calendars move separately (Microsoft, 2026).
- File shares to SharePoint and OneDrive. Shared department folders become SharePoint document libraries, the same storage Teams uses, and personal folders go to each person’s OneDrive.
- Line-of-business applications. Accounting, practice management, estimating or ERP software either moves to the vendor’s cloud edition or keeps running on a server that moves.
- Servers. A server that has to stay a server can become a virtual machine on Azure or AWS, a hosted server, or your own hardware in a colocation rack. We run server hosting and colocation in our Minneapolis data center; our comparison of hosted, cloud and on-premise options explains which fits where.
If the goal is to get rid of your server entirely, our step-by-step plan for moving your server to the cloud covers that project in detail.
What are the 7 Rs of cloud migration?
The 7 Rs are the seven cloud migration strategies AWS documents for deciding what happens to each system: retire, retain, rehost, relocate, repurchase, replatform, and refactor (also called re-architect). You choose one per system, not one for the whole company, and AWS describes refactoring as the most complex and costly of the seven (AWS Prescriptive Guidance, 2022).
| Strategy | What it means | Small business example |
|---|---|---|
| Retire | Switch it off | An old print server, or software nobody has opened in a year |
| Retain | Leave it where it is for now | A PC that runs equipment on the shop floor |
| Rehost (“lift and shift”) | Move it unchanged to new hosting | A Windows server copied to a virtual machine in a data center or on a cloud platform |
| Relocate | Move a whole virtualization platform to a cloud version of the same platform | A group of virtual servers moved without converting them |
| Repurchase | Replace it with a different product, usually software as a service | An Exchange server replaced by Microsoft 365, or desktop accounting software by its cloud edition |
| Replatform | Move it with small changes to use managed services | A SQL Server database moved to a managed cloud database |
| Refactor | Redesign or rewrite it for the cloud | Custom software rebuilt by its developer |
Microsoft’s Cloud Adoption Framework uses eight terms of its own: retire, rehost, replatform, refactor, rearchitect, rebuild, replace and retain. Replace is its word for repurchase, and refactoring is split into three levels of rework. It also warns that rehosting does not fix existing performance or reliability problems; they move with the system (Microsoft, 2025).
For most small businesses, three of these do the work: repurchase, rehost and retire.
What are the steps in the cloud migration process?
For a small business, the cloud migration process comes down to seven steps:
- Inventory every system, the data in it and who depends on it.
- Choose a strategy and a destination for each system.
- Prepare the destination: licenses, accounts, multifactor authentication, and the new folder and permission structure.
- Clean up and back up the source.
- Move a pilot group and fix what breaks.
- Cut everyone else over on a planned date.
- Verify, train, then decommission the old systems.
AWS groups the same work into three phases (assess; mobilize; migrate and modernize) and recommends migrating first and modernizing afterward (AWS Prescriptive Guidance, 2022). Microsoft’s Cloud Adoption Framework uses five steps: plan, prepare, execute, optimize and decommission (Microsoft, 2025).
What belongs on a cloud migration checklist?
A cloud migration checklist should cover inventory, licensing, identity and multifactor authentication, permissions, bandwidth, data cleanup, backups, a pilot group, the cutover plan, communication and decommissioning.
Before you move anything
- Inventory. List every mailbox (shared ones too), file share, application and server, plus what touches them: scanners that save to a folder, mapped drives, printers and programs that exchange data. Note each one’s owner, data size and vendor support for cloud use. Systems that depend on each other move together.
- Licensing. Count users and shared mailboxes, choose a Microsoft 365 plan (our Microsoft 365 plan picker helps) and confirm each application’s license allows hosted or cloud use. Assign licenses promptly after an email cutover: Microsoft disables an unlicensed migrated mailbox when its 30-day grace period ends (Microsoft, 2024).
- Identity and multifactor authentication. Decide whether accounts stay synchronized with your office Active Directory or become cloud-only, and turn on multifactor authentication before data moves. Microsoft’s free security defaults require every user to register for it and block legacy authentication, including older mail protocols some scanners still use to send email, so test those devices first (Microsoft, 2025).
- Permissions mapping. Write down who can open what today and design the new structure, such as a SharePoint site per team, before copying anything. Microsoft’s SharePoint Migration Tool maps old accounts to Microsoft 365 accounts automatically where it can and can preserve file share permissions (Microsoft, 2026).
- Bandwidth. Measure your real upload speed. Microsoft throttles migration traffic more tightly during weekday business hours and accepts more on evenings and weekends, and for file shares its telemetry points to reading the source, such as the old server’s disks, as the typical bottleneck (Microsoft, 2025). For scale, 500 GB at a sustained 100 Mbps is about 11 hours of transfer.
- Data cleanup. Delete or archive what nobody needs. The SharePoint Migration Tool can skip files not modified since a date you choose and replace characters SharePoint does not allow in file names (Microsoft, 2026). Shorten folder paths over 400 characters, the limit for a full path and file name in SharePoint and OneDrive (Microsoft, 2026).
- Backups, before and after. Back up every source system and test a restore before the first copy. Microsoft’s migration tools copy files and leave the originals in place (Microsoft, 2026), so make the old shares read-only at cutover. Back up the new copy from day one too; our article on whether data in the cloud needs a backup explains why. We back up Microsoft 365 email, OneDrive and SharePoint daily for $5 per user per month.
During the move
- Pilot group. Move a few willing people or one small team first, for a normal week of work. Have them use shared mailboxes, calendars, scanning, synced libraries and every application that opens files, and fix what breaks before anyone else moves.
- Cutover plan and timing. Pick a date away from month-end, payroll and your busy season, and set rollback criteria in advance, as Microsoft’s framework advises (Microsoft, 2025). Before an email move, lower your MX record’s time-to-live to 3,600 seconds or less; after the switch, other mail systems can take up to 72 hours to notice (Microsoft, 2024).
- Communication. Tell staff what changes and when, what they must do (register for multifactor authentication, sign in again, find files in their new place) and who to call. On the first morning, send a short note with the new locations and the help desk number.
After the move
- Verify. Check item counts, open a sample of files, send and receive email from outside, and test phones, remote access and every application.
- Training. Show people where their files went, how sharing links work and how to restore an earlier version, then update onboarding so new hires learn the new way.
- Decommissioning. Keep the old system read-only for an agreed period, then retire it: cancel old hosting and software subscriptions, remove outdated DNS records, and wipe and recycle the hardware.
What are the biggest cloud migration challenges, and how do you avoid them?
The common ones are application compatibility, permissions, bandwidth and sync limits, cost surprises, training, downtime and compliance. Each has a practical fix:
- Application compatibility. Some software needs a Windows server, a drive letter or a local database. Ask each vendor about a cloud edition and about support on a hosted server, and never put an application’s database or company file in a synced folder unless the vendor supports it. Anything that fails these tests is a candidate to retain or rehost.
- Permissions. Copying a messy file share copies the mess. Clean up groups first and grant access by site or team, not file by file; Microsoft’s recommended general limit is 5,000 unique permissions in a list or library (Microsoft, 2026).
- Bandwidth and sync limits. Run bulk copies at night and on weekends, and don’t make everyone sync everything. Microsoft recommends syncing no more than 300,000 files in one library, and slowdowns can appear when the libraries a person syncs hold 300,000 items in total (Microsoft, 2026). Open the rest in Teams or the browser.
- Cost surprises. Cloud services are metered and typically charged per use, one of the five essential characteristics in NIST’s definition (NIST SP 800-145, 2011), so a server running around the clock is billed around the clock, and you pay for old and new systems while they overlap. Price licenses, hosting, backups and support for the next few years; our guide to maximizing cloud migration ROI walks through it.
- Training. People who can’t find their files make copies and email attachments. Train the pilot group first, then everyone, with the real folders in front of them.
- Downtime. Much of the copying happens while people keep working: email reaches the old server until the MX record changes, and a final pass picks up recent changes. Microsoft’s framework contrasts simpler downtime migrations with near-zero downtime migrations that need continuous replication and testing (Microsoft, 2025).
- Compliance. If you hold health, financial or other regulated data, confirm where the new service stores it, what the provider will sign and how you will keep audit evidence; AWS names data residency requirements as a reason to retain an application (AWS Prescriptive Guidance, 2022). We have been audited under SOC 2 by independent auditors every year since 2018 and hold a current SOC 2 Type II report.
Common questions
How long does a cloud migration take?
It depends on how much data you have, how fast you can upload it and how much cleanup the old system needs. The copy itself is mostly arithmetic: data size divided by the upload speed you can sustain overnight. Schedule inventory, permissions and cleanup first, and plan the cutover for an evening or weekend.
What is lift and shift?
Lift and shift is another name for rehosting: moving a server or application to new hosting without changing it. It is a fast, low-risk way to get a server out of the office closet, but it carries over existing problems, so fix known performance or reliability issues first or plan to modernize afterward.
Can you move to the cloud without downtime?
Nearly. Email and files can be copied while people keep working, then topped up with a final sync on cutover night, so most people notice only a fresh sign-in and a new Outlook profile. Near-zero downtime for a busy database needs continuous replication and more testing; for most small offices, a planned weekend window is simpler.
Is colocation the same as moving to the cloud?
No. With colocation, your own server moves into a data center rack that supplies power, cooling, physical security and a fast connection, and you still own and maintain the hardware. Cloud services rent you computing resources on demand instead. Colocation suits a server you have already paid for, and it can be a step toward the cloud.
What does a cloud migration cost a small business?
The project depends on the number of users, the amount of data and what moves, so we quote migrations separately. After the move, our monthly managed IT rates are $150 for a cloud environment (Microsoft, AWS, Google and similar), $150 for a server or virtual machine and $50 per computer, with Microsoft 365 licenses at Microsoft’s rate.
Talk to us
If you are weighing a move to Microsoft 365, a hosted server or our Minneapolis data center, we can go through this checklist with you, look at what you run today and recommend a strategy for each system before anything moves. To start, call us at 952-548-5558 or contact us. The first conversation is free, usually about half an hour, and there is no long-term contract.